Friday, 12 December 2014

bca6022 smu bca fall 2014 IVth sem assignment

Get fully solved assignment, plz drop a mail with your sub code
computeroperator4@gmail.com
Charges for mba rs 125/subject and rs 700/semester only.
For other rs 125/subject only
if urgent then call us on 08791490301, 08273413412
our website is www.smuassignment.in

PROGRAM- BCA (REVISED FALL 2012)
SEMESTER- 6
SUBJECT CODE & NAME- BCA6022, Software Project Management
Qus:1 What are the factors influencing project management? Explain the role of project manager.
Answer:
The Factors Influencing Project Management:
These three factors are the time, cost, and the scope represented as the vertices of the triangle. The importance of quality on the product being built is represented as the central theme of the triangle.

Qus:2 What do you mean by software cost estimation process? Why software cost estimation is required?
Answer:
Software Cost Estimation Process:
The project cost includes the requirements for software, hardware and human resources. The bulk of the cost of software development is due to the human resources needed, and most cost estimation procedures focus on this aspect. Most cost estimates are determined in terms of person-months (PM).

Qus:3 Define risk assessment. Explain the elements of risk assessment and risk control.
Answer:
Risk Assessment:
Risk Assessment deals with estimation of level of risk involved in the project. It basically is the methodology of identifying the probability of occurrence of adverse event and estimating the intensity of the effects in case of occurrence of the said event. Hence risk assessment can be thought of being at the heart of risk management assisting the information gathering needed to respond

Qus:4 What is conflict management? How do we remove conflicts among team members?
Answer:
Conflict Management:
A conflict occurs for various reasons. But each conflict should be resolved in proper time. Conflict management refers to the long-term management of intractable conflicts. It is the label for the variety of ways by which people handle grievances standing up for what they consider to be right and against what they consider to

Qus:5 Describe briefly the activities of software reengineering. Draw the necessary diagram.
Answer:
The activities of Software Reeengineering:
1.Inventory analysis: Every software organization should have an inventory of all applications. The inventory can be nothing more than a spreadsheet model containing information that provides a detailed description (e

Qus:6 What do you mean by software testing? Why it is required?
Answer:
Software Testing:
Software testing is the process of running through the application or a software product with the intention of uncovering the errors. It is the mechanism by which one can ascertain that the product meets its intended specifications. This is different from other physical process which has a predefined set of inputs and outputs. Because of this predefined input and output, the physical systems fail in a particular way. Same
Get fully solved assignment, plz drop a mail with your sub code
computeroperator4@gmail.com
Charges for mba rs 125/subject and rs 700/semester only.
For other rs 125/subject only
if urgent then call us on 08791490301, 08273413412

our website is www.smuassignment.in

No comments:

Post a Comment