BT0092, Software Project Management
Qus:1 Explain Hierarchical Organizational Structure.
Answer: The key features of Hierarchical Organization Structure are given below:
 It is based on the concepts of division of labor, specialization, and unity of command.
 Key decisions are made at the top and filter down through the organization.
 Middle managers


Qus:2 What are the factors influencing Project Management?
Answer: Project management is often summarized in a triangle. The three most important factors are time, cost and scope. These form the vertices with quality as a central theme.
1) Projects must be delivered on time.
2) Projects must be within cost.
3)



Qus:3 What are the different tasks performed in project planning?
Answer: Every project starts with initiation. In which project scope, pros and cons are discussed. Once the project initiation phase is completed, the project team, usually the project manager and the analysts in the early stages, must determine the scope of the effort necessary to accomplish the necessary tasks. There are many methods available for accomplishing this planning process; many of them use graphics of varying types, but all require the same basic information.

Qus:4 Mention and explain different types of Software Testing.
Answer: Software testing consists of several subcategories, each of which is done for different purposes, and often – using different techniques. Software testing categories include:
 Functionality testing to verify the proper functionality of the software, including validation of system and



Qus:5 Mention different Software cost estimation methods.
Answer: A number of methods have been used to estimate software costs.
Algorithimic Models
These methods provide one or more algorithms which produce a software cost estimate as a function of a number of variables which relate to some software metric (usually its size) and cost driv



Qus:6 Mention different features of a PERT chart.
Answer: PERT (Program Evaluation and Review Technique) is basically a method to analyze the tasks involved in completing a given project, especially the time needed to complete each

Get fully solved assignment. Buy online from website
online store
or
plz drop a mail with your sub code
we will revert you within 2-3 hour or immediate
Charges rs 125/subject



No comments:

Post a Comment