Saturday 27 May 2017

mba205 smu mba spring 2017 (jul/aug 2017 exam) IInd sem assignment

Get fully solved assignment. Buy online from website
online store
or
plz drop a mail with your sub code
we will revert you within 2-3 hour or immediate
Charges rs 125/subject

ASSIGNMENT
DRIVE    Spring 2017
PROGRAM          MBA
SEMESTER           II
SUBJECT CODE & NAME                MBA205
OPERATIONS RESEARCH
Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme.
Set 1

Question1. Explain the process of OR.
Answer:
Operations Research is “the use of mathematical models, statistics and algorithms to aid in decision-making. It is most often used to analyze complex real-world systems, typically with the goal of improving or optimizing performance. It is one form of applied mathematics.” (Wikipedia)
The quest

Question2.  a. Discuss any four applications of linear programming.
Answer2a. Four applications of linear programming are as follows


b. An organisation produces X1 and X2 units of products R and S, respectively. In this case, the objective function and constraints are expressed as follows:
Maximise                        Z = 60X1 + 120X2
 Subject to,                     3X1 + 6X2   ≤   240         Raw material constraint                    
                                          2X1 + 4X2   ≤   800        Labour hours constraint             
                                          X1, X2         ≥   0            Non-negativity condition
Use graphical method to determine how many units of products R and S the organisation should produce to maximise its profits.

Answer 2(b) - Here,
We have to maximise Z = 60X1 + 120X2

Question3.a. Explain the concept of Trans-shipment.
Answer3(a). Transhipment is the act of off-loading a container from one ship and loading it onto another ship. In any service operated by any line there are practical restrictions in terms of coverage of


b. Solve the following transportation problem using North-west corner method & Matrix minimum method.



Answer3(b).



The

Set 2

Question1. The processing time of four jobs and five machines (in hours, when passing is not allowed) is given in following table
a. Find an optimal sequence for the above sequencing problem.
b. Calculate minimum elapsed time & idle time for machines A, B, C, D & E.
Answer1.


Question2. Define following criteria’s used for decision making under Uncertainty
a. Optimism (maximax or minimin) criterion

Answer 2(a).
Maximax (Optimist)
The maximax looks at the best that could happen under each action and then chooses the action with the largest

b. Pessimism (maximin or minimax) criterion

Answer2(b).

Maximin (Pessimist)
The maximin person looks at the worst that could happen under each action and then choose the action with the largest payoff. They assume that the worst that can happen will, and then they take the
c. Equal probabilities (Laplace) criterion

Answer2(c).
Laplace criterion is also called as law of equal probabilities criterion or criterion of rationality, since probability of states of nature are not known it is assumed that all states of nature will occur in equalprobability. I.e. assign an equal probability

d. Coefficient of optimism (Hurwicz) criterion



Answer2(d).

A compromise between the maximax and maximin criteria. The decision maker is neither totally optimistic (as the maximax criterion assumes) nor totally pessimistic (as the maximin criterion assumes). With the Hurwicz criterion,

e. Regret (salvage) criterion

Answer2(e).

Question3. Explain the following:
a. Economic Order Quantity (EOQ)

Answer 3(a).
Economic order quantity (EOQ) is an equation for inventory that determines the ideal order quantity a company should purchase for its inventory given a set cost of production, demand rate and other variables. This is done to minimize variable inventory costs, and the formula takes into account storage, or holding


 b. PERT and CPM

Answer 3(b).
PERT stands for Program Evaluation Review Technique, a methodology developed by the U.S. Navy in the 1950s to manage the Polaris submarine missile program. A similar methodology, the Critical Path Method (CPM) was developed for project management in the private sector at about the same time.
CPM and PERT (Program Evaluation and Review Technique) are most commonly used methods for project

c.  Applications of queuing models

Answer 3(c).
Queueing Theory has a wide range of applications, and this section is designed to give an illustration of some of these.  It has been divided into 3 main sections, Traffic Flow, Scheduling and Facility Design and Employee


Get fully solved assignment. Buy online from website
online store
or
plz drop a mail with your sub code
we will revert you within 2-3 hour or immediate
Charges rs 125/subject



No comments:

Post a Comment