Thursday, 3 March 2016

om0017 smu mba winter 2015 (april/may 2016 exam) IVth sem assignment

Get fully solved assignment. Buy online from website
online store
or
plz drop a mail with your sub code
we will revert you within 2-3 hour or immediate
Charges rs 125/subject and rs 700/semester only.
if urgent then call us on 08791490301, 08273413412


DRIVE: Winter 2015
PROGRAM: MBADS (SEM 4/SEM 6) MBAFLEX/ MBA (SEM 4) PGDOMN (SEM 2)
SUBJECT CODE & NAME: OM 0017 – ADVANCED PRODUCTION AND PLANNING CONTROL (4 CREDITS)
BK ID: B2010
MARKS: 60

Qus:1 Explain the flow of information in a production process.
·         Describe why information flow is critical in production planning with a help of an example
·         Describe the flow of information in a production process
·         List the factors that need to considered in a flow of information in a production process
Answer:
Describe why information flow is critical in production planning with a help of an example:

The organisational goals, strategies, and plans need to be communicated well within the organisation, so that the right procedure can be followed


Q.2: What are the various techniques of costing?
·         List the various techniques of costing
·         Explain the 6 techniques of costing

Answer:
Q.2: What are the various techniques of costing?
List the various techniques of costing
Explain the 6 techniques of costing

Answer:
Various techniques of costing:
Following are the types of costing techniques which are used by management only for controlling costs and making some important managerial decisions.
1.      Marginal Costing
2.      Direct


Qus:3 Explain any TEN features of the Advanced Planning and Scheduling (APS) system.
·         List and describe any TEN features of the Advanced Planning and Scheduling (APS) system
Answer:
List and describe any TEN features of the Advanced Planning and Scheduling (APS) system:


Q.4: What are the rules for scheduling Kanban production?
·         List rules for scheduling Kanban production
·         Explain the 6 rules for scheduling Kanban production

Answer:
List rules for scheduling Kanban production:
Scheduling in lean production is done by using kanban cards. Kanban cards are forwarded to the scheduled board, where

Q.5: What are factors must be considered while implementing a production planning and control system?
·         Explain the 4 factors to be considered while implementing a production planning and control system

Answer:
Explain the 4 factors to be considered while implementing a production planning and control system:
Manufacturing organizations generally consider certain factors while implementing the system they select. These factors help


Q.6: Mention the reasons why manufacturing organizations choose Excel and Visual Basic prototype as planning and scheduling tools.
·         List the 8 reasons why manufacturing organizations choose Excel and Visual Basic prototype as planning and scheduling tools

Answer:
List the 8 reasons why manufacturing organizations choose Excel and Visual Basic prototype as planning and scheduling tools:

The reasons for choosing Excel and Visual Basic prototype as the planning and scheduling tools by manufacturing organisations:
1.      These tools can be used

Get fully solved assignment. Buy online from website
online store
or
plz drop a mail with your sub code
we will revert you within 2-3 hour or immediate
Charges rs 125/subject and rs 700/semester only.
if urgent then call us on 08791490301, 08273413412



No comments:

Post a Comment