Saturday, 10 June 2017

mca114 smu mca spring 2017 (jul/aug 2017 exam) Ist sem assignment

Get fully solved assignment. Buy online from website
online store
or
plz drop a mail with your sub code
we will revert you within 2-3 hour or immediate
Charges rs 125/subject
If urgent then call us on 08791490301

STUDENT NAME:-
ROLL NO:-
ASSIGNMENT DRIVE - SPRING 2017
PROGRAM MASTER OF COMPUTER APPLICATION
SEMESTER 1
SUBJECT CODE & NAME - MCA114 - System Analysis And Design
BK ID B1647 CREDITS    4 MAX. MARKS 30 marks

Assignment Set -1 Questions
Q1 a. Explain the concept of waterfall development methodology.  6
b. Discuss the advantages and disadvantages of this methodology. 4
Answer:-
a. The concept of waterfall development methodology:-
Waterfall development is considered as the original methodology of structured design, which is still used today. Waterfall Development methodology develops the system methodically from one phase to another in a downward manner,

Q2 Define conversion. Illustrate the various methods used for conversion [2+8] 10
Answer:-
Conversion:-
The process of converting the old system to the new system is known as conversion. This process must be planned and performed in a proper manner. There are four methods which are common in use

Generally, systems conversion should be achieved in minimum time as possible. If the conversion process takes longer time, then it creates difficulties for all persons concerned involving both analysts and users.
METHODS:-
(a) Parallel systems: Running both systems in parallel is the most protected method of converting from an old to new system. Here, users keep on operating the old system in the normal way, but they also start utilising the new system. This method is the most secured one. This is because it makes sure that if any problem occurs in using the new system, the organisation can still move to the old system without loss of time and money.
The disadvantages of parallel systems are:
 It doubles the costs of operating.
 The new system may not be provided for trial.
(b) Direct conversion: Direct conversion method is switching over directly to the new system, on the appointed date and time. At times, it happens over a weekend or even overnight. The old system is used in anticipation of a planned conversion day, when it is substituted by the new system. No parallel activities are included. The organisation totally depends on the new system. The major drawbacks of this approach are: on occurrence of difficulties with the new system, no other system can be used.  Secondly, sensible and cautious planning is needed.
(c) Pilot system: Pilot approach is frequently chosen in the case of the new system, which involves new methods or some severe changes in organisation performance. Here, a running version of the system is implemented in one part of the organisation, like a single work area or department. The users are familiar with that they are piloting a new system. Also they know that they can make changes to improve the system. Changes are made according to the feedback. The Pilot System method offers experience and live test prior to implementation.
(d) Phase-in method: When it is not possible to set up a new system in an organisation at the same time, phase-in method is used. It permits some users to take benefit of the new system before time. Also it permits training and installation without needless utilisation of resources.


Q3 What is the role of project manager? List out the various tasks performed by the project manager [2+8] 10
Answer:-
The role of project manager:-
The project manager ensures that the project is finished timely and within the specified budget. He or she also ensures that the system provides all advantages that were planned by the project sponsor. 
The function of the project manager comprises of handling the team members, generating the project plan, allocating resources, and being the main contact point when people external to the team have queries regarding the

Assignment Set -2 Questions
Q1 Explain about real time systems and distributed systems. 5+5=10
Answer:-
Real time systems:-
Systems that must produce the output within specified limits of time after obtaining the requisite input are referred to as real time systems. Real time systems include all those systems that have a very small response time. Typically, a real time system consists of the components organised in the following manner, as shown in figure

Q2 Differentiate between operational information and strategic information. 5+5=10
Answer:-
Operational Information:-
Operational Information is required for daily operations of the organisation such as daily sales, billing. With this

Q3 Write short note on Analysis and Design in software development life cycle. 5+5=10
Answer:-
System development is quite a challenging and difficult task. In developing a big integrated system, like MIS, a lot of people are involved and several months or even years are devoted for completion. But, a small autonomous application, like payroll, can be generated in a number of weeks or months by a single or only a few programmers. For these kinds

Get fully solved assignment. Buy online from website
online store
or
plz drop a mail with your sub code
we will revert you within 2-3 hour or immediate
Charges rs 125/subject
If urgent then call us on 08791490301



No comments:

Post a Comment